Change - Over Switch 160A 3p Load Isolation Switch Double Layer

Product feature1) Use reinforced unsaturated polyester resin glass fiber shell.2) The spring accumulator quickens making and breaking.3) The contact structure is parallel double breakpoint bridge contact surface, guarantee contact pressure by leaf springs.4) The switches can automatically determine the switching off position.Wor

Featured Products

Product feature

1) Use reinforced unsaturated polyester resin glass fiber shell.

2) The spring accumulator quickens making and breaking.

3) The contact structure is parallel double breakpoint bridge contact surface, guarantee contact pressure by leaf springs.

4) The switches can automatically determine the switching off position.


Working environment

 GL1 Series Load isolation switch can work reliably under the following conditions:

1) Height about level does not exceed 2000m

2) Ambiebt temperature is not higher than 40ºC and not lower than -5ºC

3)Relative humidity is not larger than 95%

4) No explosive dangerous medium environment

5) No rain and show attack environment

Noted: The user should be the manufacturer's instructions, if the product is expected to use in the ambient air temperature is higher than +40ºC or below -5ºC ----  -45ºC conditions.
 

Product pictures

Change-Over Switch 160A 3p Load Isolator Switches Double Deck Change-Over Switch 160A 3p Load Isolator Switches Double Deck
 

Installation

Change-Over Switch 160A 3p Load Isolator Switches Double Deck
 

Workshop

Change-Over Switch 160A 3p Load Isolator Switches Double Deck
 

Packaging & Shipping

Change-Over Switch 160A 3p Load Isolator Switches Double Deck
 


FAQ

Q1. What is your terms of packing?
A: Generally, we pack our goods in Cartons and Pallets. If you have any special package, 
we can pack the goods according to your requirements.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages 
before you pay the balance.

Q3. What is your terms of delivery?
A: FOB, CFR, CIF.

Q4. How about your delivery time?
A: Generally, it will take 30 days after receiving your advance payment. The specific delivery time depends 
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and 
the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

If any requiremenst, pls contact me.

 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours